Downtown-Natomas-Airport Corridor Study
 HOME   CONTACT US   E-MAIL A FRIEND 
 
   PROJECT OVERVIEW                    
   LOCALLY PREFERRED ALTERNATIVE
   ALTERNATIVES ANALYSIS
   
  Overview
.................................
  Alternatives Analysis Report
.................................
  Detailed Alternatives
.................................
  Alternative Selection Process
   

   GET INVOLVED                            

   NEWS & LIBRARY ARCHIVES
   FAQs                                         

   ACRONYMS                                 

section title: Alternatives Analysis

Detailed Alternatives
Revised July 1, 2004

Based on the initial screening of alternatives, the alternatives currently under consideration include a No-Action Alternative, a Transportation Systems Management (TSM) alternative, and three Light Rail Transit (LRT) alternatives. In addition, several sub options are being evaluated as part of these alternatives. A brief description of the alternatives is provided below.

Alternative 1: No-Action. This alternative consists of highway and transit systems existing as of year 2000, plus programmed improvements. It serves as the NEPA baseline against which the environmental and community impacts of the other alternatives are compared.

Alternative 2: Baseline/TSM Alternative. This alternative consists of all reasonable cost-effective transit service improvements within the DNA corridor that are in the financially constrained regional transportation plan, short of a major investment.

Alternative 3: LRT to Airport via Truxel Road. This alternative consists of double-track light rail service from downtown Sacramento to the Sacramento International Airport and includes an LRT bridge with bicycle and pedestrian access across the American River through Discovery Park at Truxel Road. Feeder bus service is provided to most LRT stations. This alternative was adopted as the Locally Preferred Alternative for the DNA Corridor by the RT Board of Directors on December 15, 2003.

Alternative 3A: Truxel LRT Starter Line. This alternative consists of a mix of single and double-track light rail service from downtown Sacramento to the Sacramento International Airport and includes an LRT bridge with bicycle and pedestrian access across the American River through Discovery Park at Truxel Road. Feeder bus service is provided to most LRT stations.

Alternative 3B: Truxel LRT Minimum Operable Segment (MOS). This alternative consists of single and double-track light rail service from downtown Sacramento to the Natomas Town Center in North Natomas. A direct bus connection will be provided from the Natomas Town Center to the Sacramento International Airport. This alternative includes an LRT bridge with bicycle and pedestrian access across the American River through Discovery Park at Truxel Road. Feeder bus service is provided to most LRT stations.
Alignment sub options to those described above are being considered at specific locations. These include, but are not limited to:

  • An alignment along 5th/6th Street between Sacramento Valley Station and the American River

  • Crossing the American River at North 5th Street;

  • Options for crossing Interstate 80 using the existing Truxel Road overcrossing or a new LRT-only overcrossing east of the existing structure.

...................top....................